|
- Set Out Works of MCG
- Feature Survey
- Set Out Plan for Track and Field Facilities
- Cricket Pitch Location
- Surface Level Survey
- Contours of ground at 5cm intervals
- Feature and Level Survey of adjoining portable
wickets
- Feature and Level Survey of main east entrance
ramp
|